1 P54875 PRE-QUALIFICATION NOTICE FY 2026-2027
Secretariat of the Council of Common Interest (CCI) (Council of Common Interest (CCI))
Closing Time: 1h 53m Left | Opening Time: 2h 23m Left
Consultancy Services Single Stage-One Envelope
2 P55982 Consultancy Services for Construction of Bahria Un...
Bahria University (Bahria University)
Closing Time: Wednesday, July 22, 2026 02:00 PM | Opening Time: Wednesday, July 22, 2026 02:30 PM
Consultancy Services Single Stage-Two Envelope
3 P47957 Procurement of Consultancy Services For Comparativ...
Public Procurement Regulatory Authority (PPRA) (Federal Public Procurement Regulatory Authority (PPRA))
Closing Time: Wednesday, July 22, 2026 02:00 PM | Opening Time: Wednesday, July 22, 2026 02:30 PM
Consultancy Services Single Stage-Two Envelope
4 P52550 Appointment of an Independent Audit Firm to Conduc...
Pakistan Reinsurance Company Limited (Ministry of Commerce)
Closing Time: Thursday, July 23, 2026 11:00 AM | Opening Time: Thursday, July 23, 2026 11:30 AM
Consultancy Services Single Stage-One Envelope
5 P52502 10. RFQ HIRING OF ARCHITECTURAL FIRMS/CONSULTANTS ...
IESCo Civil Division (Islamabad Electric Supply Company (IESCO))
Closing Time: Thursday, July 23, 2026 11:00 AM | Opening Time: Thursday, July 23, 2026 11:30 AM
Consultancy Services Single Stage-Two Envelope
6 P53366 HIRING OF ENGINEERING/ ARCHITECTURAL CONSULTANCY S...
Quaid-e-Azam University Islamabad. (Ministry of Federal Education and Professional Training)
Closing Time: Thursday, July 23, 2026 02:00 PM | Opening Time: Thursday, July 23, 2026 02:30 PM
Consultancy Services Single Stage-Two Envelope
7 P56192 Appointment of Statutory (External) Auditors
National Power Parks Management Company (NPPMCL – National Power Parks Management Company. Pvt. Ltd)
Closing Time: Friday, July 24, 2026 11:00 AM | Opening Time: Friday, July 24, 2026 11:30 AM
Consultancy Services Single Stage-Two Envelope
8 P55085 Hiring of a firm for Independent Technical Vetting...
Material Management (Peshawar Electric Supply Company (PESCO))
Closing Time: Monday, July 27, 2026 10:00 AM | Opening Time: Monday, July 27, 2026 10:30 AM
Consultancy Services Single Stage-Two Envelope
9 P57866 REQUEST FOR EXPRESSION OF INTEREST (REOI) Independ...
Management Services Wing (Establishment Division)
Closing Time: Monday, July 27, 2026 11:00 AM | Opening Time: Monday, July 27, 2026 11:30 AM
Consultancy Services Single Stage-One Envelope
10 P59645 Tender No. P-39 Consultancy Services for an Indepe...
Pakistan Revenue Automation Pvt Limited (Pakistan Revenue Automation Pvt Limited)
Closing Time: Tuesday, July 28, 2026 11:00 AM | Opening Time: Tuesday, July 28, 2026 11:30 AM
Consultancy Services Single Stage-Two Envelope
11 P55256 HIRING OF ENGINEERING / ARCHITECTURAL FIRM FOR EVA...
National Archives of pakistan (Attach Department)
Closing Time: Tuesday, July 28, 2026 12:00 PM | Opening Time: Tuesday, July 28, 2026 12:30 PM
Consultancy Services Single Stage-Two Envelope
12 P60053 Hiring of External Auditors for Daanish University...
Daanish University Trust (Daanish University Trust)
Closing Time: Tuesday, July 28, 2026 02:00 PM | Opening Time: Tuesday, July 28, 2026 02:30 PM
Consultancy Services Single Stage-Two Envelope
13 P49757 Editing proof reading of PTA's Annual report 2026
Pakistan Telecommunication Authority (PTA). (Pakistan Telecommunication Authority (PTA).)
Closing Time: Wednesday, July 29, 2026 11:00 AM | Opening Time: Wednesday, July 29, 2026 11:30 AM
Consultancy Services Single Stage-One Envelope
14 P62267 Hiring of One (01) Individual Consultant (Advisory...
Ministry of Federal Education and Professional Training. (Ministry of Federal Education and Professional Training)
Closing Time: Wednesday, July 29, 2026 02:00 PM | Opening Time: Wednesday, July 29, 2026 02:30 PM
Consultancy Services Single Stage-Two Envelope
15 P54194 EOI/SELECTION OF CONSULTANT / INTERNATIONALLY REPU...
OGRA (Oil & Gas Regulatory Authority)
Closing Time: Thursday, July 30, 2026 11:00 AM | Opening Time: Thursday, July 30, 2026 11:30 AM
Consultancy Services Single Stage-Two Envelope
16 P29090 CONSULTANCY SERVICES FOR ENGINEERING SYSTEMS TRANS...
Pakistan Airports Authority (Planning & Development Directorate)
Closing Time: Thursday, July 30, 2026 11:00 AM | Opening Time: Thursday, July 30, 2026 11:30 AM
Consultancy Services Single Stage-Two Envelope
17 P55034 Hiring of Cybersecurity Consultant
National Electric Power Regulatory Authority (NEPRA) (National Electric Power Regulatory Authority (NEPRA))
Closing Time: Thursday, July 30, 2026 02:00 PM | Opening Time: Thursday, July 30, 2026 02:30 PM
Consultancy Services Single Stage-Two Envelope
18 P60515 Hiring of Services of Independent Transaction Advi...
Overseas Pakistanis Foundation (OPF) (Overseas Pakistanis Foundation (OPF))
Closing Time: Friday, July 31, 2026 12:00 PM | Opening Time: Friday, July 31, 2026 12:30 PM
Consultancy Services Single Stage-Two Envelope
19 P54863 Hiring of Consultancy Services for Third Party Val...
Overseas Pakistanis Foundation (OPF) (Overseas Pakistanis Foundation (OPF))
Closing Time: Friday, July 31, 2026 12:00 PM | Opening Time: Friday, July 31, 2026 12:30 PM
Consultancy Services Single Stage-Two Envelope
20 P62174 PROCUREMENT / APPOINTMENT OF TAX ADVISOR ON RETAIN...
PIAHCL (Accounts & Finance)
Closing Time: Friday, July 31, 2026 04:00 PM | Opening Time: Friday, July 31, 2026 04:30 PM
Consultancy Services Single Stage-One Envelope
21 P55091 Tender No 4424 IT Cybersecurity Audit & NEPRA Comp...
LAHORE ELECTRIC SUPPLY COMPANY (MATERIAL MANAGEMENT)
Closing Time: Monday, August 3, 2026 10:30 AM | Opening Time: Monday, August 3, 2026 11:00 AM
Consultancy Services Single Stage-One Envelope
22 P64460 SSGC/SC/NR/EPADS2/14396 (HIRING OF CONSULTANCY FI...
SSGC (PROCUREMENT DEPARTMENT)
Closing Time: Monday, August 3, 2026 11:00 AM | Opening Time: Monday, August 3, 2026 11:30 AM
Consultancy Services Single Stage-Two Envelope
23 P65897 REQUEST FOR PROPOSALS (RFP) Hiring of Third-Party ...
Engineering Development Board EDB (Ministry of Industries and Production)
Closing Time: Tuesday, August 4, 2026 02:00 PM | Opening Time: Tuesday, August 4, 2026 02:30 PM
Consultancy Services Single Stage-Two Envelope
24 P64049 Hiring of Services of Legal Advisor for winding-up...
Power Holding Limited (Power Holding Limited)
Closing Time: Wednesday, August 5, 2026 11:00 AM | Opening Time: Wednesday, August 5, 2026 11:30 AM
Consultancy Services Single Stage-Two Envelope
25 P56426 Engagement of Legal Consultant in PAA
Pakistan Airports Authority (Headquarters)
Closing Time: Wednesday, August 5, 2026 11:00 AM | Opening Time: Wednesday, August 5, 2026 11:30 AM
Consultancy Services Single Stage-Two Envelope
26 P54653 HIRING OF SERVICES OF AN INDEPENDENT AUDIT FIRM FO...
State Life Insurance Corporation of Pakistan (State Life Insurance Corporation of Pakistan)
Closing Time: Thursday, August 6, 2026 11:00 AM | Opening Time: Thursday, August 6, 2026 11:30 AM
Consultancy Services Single Stage-Two Envelope
27 P66470 Tender for Hiring of Audit Firm
Trade Development Authority of Pakistan (Trade Development Authority of Pakistan (TDAP))
Closing Time: Thursday, August 6, 2026 11:00 AM | Opening Time: Thursday, August 6, 2026 11:30 AM
Consultancy Services Single Stage-Two Envelope
28 P55064 Hiring of Consultancy Services for Development of ...
Directorate General Pakistan Post (Directorate General, Pakistan Post)
Closing Time: Monday, August 17, 2026 11:30 AM | Opening Time: Monday, August 17, 2026 12:00 PM
Consultancy Services Single Stage-Two Envelope
29 P54479 Supply, Installation, Testing and Commissioning of...
Works Directorate (National University of Science & Technology (NUST))
Closing Time: 1h 23m Left | Opening Time: 1h 53m Left
Works Single Stage-One Envelope
30 P54974 DEMOLITION OF SHEDS AT J-BOND AT KPT HEAD OFFICE
Civil Works Dept, KPT (Karachi Port Trust (KPT))
Closing Time: 21h 53m Left | Opening Time: 22h 23m Left
Works Single Stage-One Envelope
31 P55505 REPAIR AND MAINTENANCE OF CIVIL ASSETS IN AM-NORTH...
Deputy Manager (Civil), AM-North NGC, 220 kV Grid Station NKLP, Lahore (General Manager Asset Management National Grid Company (NGC-North))
Closing Time: 22h 23m Left | Opening Time: 22h 53m Left
Works Single Stage-One Envelope
32 P55577 Removing / shifting & furnishing of customer facil...
Civil Directorate MEPCO, Civil Works Division MEPCO HQ (Multan Electric Power Company (MEPCO))
Closing Time: Wednesday, July 22, 2026 02:00 PM | Opening Time: Wednesday, July 22, 2026 02:30 PM
Works Single Stage-One Envelope
33 P55157 Construction of precast wall from gate No.2 toward...
CPGCL, GENCO-II, TPS Guddu (Generation Holding Company Limited (GHCL))
Closing Time: Wednesday, July 22, 2026 02:00 PM | Opening Time: Wednesday, July 22, 2026 02:30 PM
Works Single Stage-Two Envelope
34 P55619 Re-construction of Boundary Wall (Fallen/ Tilted P...
Civil Directorate MEPCO, Civil Works Division MEPCO HQ (Multan Electric Power Company (MEPCO))
Closing Time: Wednesday, July 22, 2026 02:00 PM | Opening Time: Wednesday, July 22, 2026 02:30 PM
Works Single Stage-One Envelope
35 P55346 Construction of precast wall from K block towards ...
CPGCL, GENCO-II, TPS Guddu (Generation Holding Company Limited (GHCL))
Closing Time: Wednesday, July 22, 2026 02:00 PM | Opening Time: Wednesday, July 22, 2026 02:30 PM
Works Single Stage-Two Envelope
36 P55340 Repair / maintenance of Bungalow No.B-35, C-6 an...
Civil Directorate MEPCO, Civil Works Division MEPCO HQ (Multan Electric Power Company (MEPCO))
Closing Time: Wednesday, July 22, 2026 02:00 PM | Opening Time: Wednesday, July 22, 2026 02:30 PM
Works Single Stage-One Envelope
37 P56582 MAINTENANCE / REPAIR AND ALLIED CIVIL WORKS TO PSF...
Civil Works Dept, KPT (Karachi Port Trust (KPT))
Closing Time: Thursday, July 23, 2026 10:30 AM | Opening Time: Thursday, July 23, 2026 11:00 AM
Works Single Stage-One Envelope
38 P56588 Hiring Photocopy Services
NAB Lahore (National Accountability Bureau: NAB)
Closing Time: Thursday, July 23, 2026 11:00 AM | Opening Time: Thursday, July 23, 2026 11:30 AM
Works Single Stage-One Envelope
39 P55655 CONSTRUCTION OF BOUNDARY WALL AND WATCH TOWERS AT ...
Bahria University (Bahria University)
Closing Time: Thursday, July 23, 2026 11:00 AM | Opening Time: Thursday, July 23, 2026 11:30 AM
Works Single Stage-Two Envelope
40 P55454 Construction of Auditorium Lounge
NDMA (National Disaster Management Authority (NDMA))
Closing Time: Thursday, July 23, 2026 11:00 AM | Opening Time: Thursday, July 23, 2026 11:30 AM
Works Single Stage-Two Envelope
41 P54497 EP-49 Safe Loading, Unloading, Carriage, Transport...
Project Director Construction Circle, LESCO (Lahore Electricity Supply Company (LESCO))
Closing Time: Thursday, July 23, 2026 11:30 AM | Opening Time: Thursday, July 23, 2026 12:00 PM
Works Single Stage-One Envelope
42 P54491 EP-47 Safe Loading, Unloading, Carriage, Transport...
Project Director Construction Circle, LESCO (Lahore Electricity Supply Company (LESCO))
Closing Time: Thursday, July 23, 2026 11:30 AM | Opening Time: Thursday, July 23, 2026 12:00 PM
Works Single Stage-One Envelope
43 P54500 EP-50 Safe loading, Unloading, Carriage, Transport...
Project Director Construction Circle, LESCO (Lahore Electricity Supply Company (LESCO))
Closing Time: Thursday, July 23, 2026 11:30 AM | Opening Time: Thursday, July 23, 2026 12:00 PM
Works Single Stage-One Envelope
44 P54494 EP-48 Safe Loading, Unloading, Carriage, Transport...
Project Director Construction Circle, LESCO (Lahore Electricity Supply Company (LESCO))
Closing Time: Thursday, July 23, 2026 11:30 AM | Opening Time: Thursday, July 23, 2026 12:00 PM
Works Single Stage-One Envelope
45 P54506 EP-51 Safe loading, Unloading, Carriage, Transport...
Project Director Construction Circle, LESCO (Lahore Electricity Supply Company (LESCO))
Closing Time: Thursday, July 23, 2026 11:30 AM | Opening Time: Thursday, July 23, 2026 12:00 PM
Works Single Stage-One Envelope
46 P52649 Integration of HVAC facilities at Archive building...
Civil Aviation Training Institute (CATI), Hyderabad - Pakistan Airports Authority PAA (Pakistan Airports Authority (PAA))
Closing Time: Thursday, July 23, 2026 02:00 PM | Opening Time: Thursday, July 23, 2026 02:30 PM
Works Single Stage-Two Envelope
47 P51950 REQUEST FOR PROPOSAL FOR PREQUALIFICATION OF VENDO...
State Life Insurance Corporation of Pakistan, H&AI, Peshawar Zone (State Life Insurance Corporation of Pakistan (SLIC))
Closing Time: Thursday, July 23, 2026 03:00 PM | Opening Time: Thursday, July 23, 2026 03:30 PM
Works Single Stage-One Envelope
48 P55820 Extension/Construction of 11Kv Room at 132Kv Grid ...
Project Director GSC GEPCO (Gujranwala Electric Power Company Limited (GEPCO))
Closing Time: Friday, July 24, 2026 11:00 AM | Opening Time: Friday, July 24, 2026 11:30 AM
Works Single Stage-Two Envelope
49 P55943 Extension of 11Kv Room at 132Kv Grid Station Gujra...
Project Director GSC GEPCO (Gujranwala Electric Power Company Limited (GEPCO))
Closing Time: Friday, July 24, 2026 11:00 AM | Opening Time: Friday, July 24, 2026 11:30 AM
Works Single Stage-Two Envelope
50 P56531 Extension of 11KV Room at 132KV G/S JPJattan
Project Director GSC GEPCO (Gujranwala Electric Power Company Limited (GEPCO))
Closing Time: Friday, July 24, 2026 11:00 AM | Opening Time: Friday, July 24, 2026 11:30 AM
Works Single Stage-Two Envelope
51 P55019 PAINTING OF 60-FEET HEAVY DUTY SELF SUPPORTED MAST...
Electronics Engineering Depot. (Pakistan Airports Authority (PAA))
Closing Time: Monday, July 27, 2026 10:30 AM | Opening Time: Monday, July 27, 2026 11:00 AM
Works Single Stage-One Envelope
52 P57257 XEN-EHV-TLCLHR-01(R)-2026: CONSTRUCTION AND COMPLE...
Executive Engineer TLC Division (EHV-I), NGC Lahore (National Grid Company (NGC))
Closing Time: Monday, July 27, 2026 11:00 AM | Opening Time: Monday, July 27, 2026 11:30 AM
Works Single Stage-Two Envelope
53 P58154 CONSTRUCTION OF ADDITIONAL FACILITIES AT NATIONAL ...
CDA Special Project Division - I, CDA (Capital Development Aurhority (CDA))
Closing Time: Monday, July 27, 2026 11:00 AM | Opening Time: Monday, July 27, 2026 11:30 AM
Works Single Stage-Two Envelope
54 P58604 Construction of Additional facilities in the Natio...
CDA Special Project Division - I, CDA (Capital Development Aurhority (CDA))
Closing Time: Monday, July 27, 2026 11:30 AM | Opening Time: Monday, July 27, 2026 12:00 PM
Works Single Stage-Two Envelope
55 P58472 Construction ofAddtional Facilities in the Nationa...
CDA Special Project Division - I, CDA (Capital Development Aurhority (CDA))
Closing Time: Monday, July 27, 2026 11:30 AM | Opening Time: Monday, July 27, 2026 12:00 PM
Works Single Stage-Two Envelope
56 P57287 XEN-EHV-TLCLHR-02(R)-2026: CONSTRUCTION AND COMPLE...
Executive Engineer TLC Division (EHV-I), NGC Lahore (National Grid Company (NGC))
Closing Time: Monday, July 27, 2026 01:00 PM | Opening Time: Monday, July 27, 2026 01:30 PM
Works Single Stage-Two Envelope
57 P57695 XEN-(S&I)-EHV-01(R)-2026: CIVIL WORKS, ERECTION, S...
Executive Engineer S&I Division(EHV-I) , NGC Lahore (National Grid Company (NGC))
Closing Time: Monday, July 27, 2026 02:00 PM | Opening Time: Monday, July 27, 2026 02:30 PM
Works Single Stage-Two Envelope
58 P58730 132 KV S/C Transmission Line DHA – Qila Dedar Si...
Project Director GSC GEPCO (Gujranwala Electric Power Company Limited (GEPCO))
Closing Time: Tuesday, July 28, 2026 11:00 AM | Opening Time: Tuesday, July 28, 2026 11:30 AM
Works Single Stage-Two Envelope
59 P57980 Extension of 11Kv Room at 132Kv Grid Station Cantt...
Project Director GSC GEPCO (Gujranwala Electric Power Company Limited (GEPCO))
Closing Time: Tuesday, July 28, 2026 11:00 AM | Opening Time: Tuesday, July 28, 2026 11:30 AM
Works Single Stage-Two Envelope
60 P58073 Providing & Installation of CCTV Cameras system at...
Project Director GSC GEPCO (Gujranwala Electric Power Company Limited (GEPCO))
Closing Time: Tuesday, July 28, 2026 11:00 AM | Opening Time: Tuesday, July 28, 2026 11:30 AM
Works Single Stage-Two Envelope
61 P57881 (54/27) Procurement & Installation of Asset Perfor...
Multan Electric Power Company (MEPCO) (Multan Electric Power Company (MEPCO))
Closing Time: Tuesday, July 28, 2026 11:00 AM | Opening Time: Tuesday, July 28, 2026 11:30 AM
Works Single Stage-One Envelope
62 P56657 Overhauling of Transformers Installed at National ...
National Institutes of Health (NIH) (National Institutes of Health (NIH))
Closing Time: Tuesday, July 28, 2026 11:00 AM | Opening Time: Tuesday, July 28, 2026 11:30 AM
Works Single Stage-Two Envelope
63 P59087 Hiring of Machinery and Labour for Cleaning of Nul...
Chaklala Cantonment Board (ML&C Deptt)
Closing Time: Tuesday, July 28, 2026 11:00 AM | Opening Time: Tuesday, July 28, 2026 12:00 PM
Works Single Stage-One Envelope
64 P53522 (63/CWD-II/2025-26) Construction of RE office at 1...
Civil Works Directorate, FESCO (Chief Engineer (Operation) FESCO HQ Faisalabad)
Closing Time: Tuesday, July 28, 2026 11:30 AM | Opening Time: Tuesday, July 28, 2026 12:00 PM
Works Single Stage-One Envelope
65 P54530 EP-55 Safe Loading, Unloading, Carriage, Transport...
Project Director Construction Circle, LESCO (Lahore Electricity Supply Company (LESCO))
Closing Time: Tuesday, July 28, 2026 11:30 AM | Opening Time: Tuesday, July 28, 2026 12:00 PM
Works Single Stage-One Envelope
66 P53555 (68/CWD-II/2025-26) Up-gradation of water supply a...
Civil Works Directorate, FESCO (Chief Engineer (Operation) FESCO HQ Faisalabad)
Closing Time: Tuesday, July 28, 2026 11:30 AM | Opening Time: Tuesday, July 28, 2026 12:00 PM
Works Single Stage-One Envelope
67 P54533 EP-56 Safe Loading, Unloading, Carriage, Transport...
Project Director Construction Circle, LESCO (Lahore Electricity Supply Company (LESCO))
Closing Time: Tuesday, July 28, 2026 11:30 AM | Opening Time: Tuesday, July 28, 2026 12:00 PM
Works Single Stage-One Envelope
68 P53534 (64/CWD-II/2025-26) Maintenance & Repair of E-14 Q...
Civil Works Directorate, FESCO (Chief Engineer (Operation) FESCO HQ Faisalabad)
Closing Time: Tuesday, July 28, 2026 11:30 AM | Opening Time: Tuesday, July 28, 2026 12:00 PM
Works Single Stage-One Envelope
69 P53558 (69/CWD-II/2025-26) Maintenance & Repair of 07 No....
Civil Works Directorate, FESCO (Chief Engineer (Operation) FESCO HQ Faisalabad)
Closing Time: Tuesday, July 28, 2026 11:30 AM | Opening Time: Tuesday, July 28, 2026 12:00 PM
Works Single Stage-One Envelope
70 P53543 (65/CWD-II/2025-26) Special Repair of E-Type Quart...
Civil Works Directorate, FESCO (Chief Engineer (Operation) FESCO HQ Faisalabad)
Closing Time: Tuesday, July 28, 2026 11:30 AM | Opening Time: Tuesday, July 28, 2026 12:00 PM
Works Single Stage-One Envelope
71 P54515 EP-52 Safe loading, Unloading, Carriage, Transport...
Project Director Construction Circle, LESCO (Lahore Electricity Supply Company (LESCO))
Closing Time: Tuesday, July 28, 2026 11:30 AM | Opening Time: Tuesday, July 28, 2026 12:00 PM
Works Single Stage-One Envelope
72 P53513 (61/CWD-II/2025-26) Up-Raising of Boundary Wall at...
Civil Works Directorate, FESCO (Chief Engineer (Operation) FESCO HQ Faisalabad)
Closing Time: Tuesday, July 28, 2026 11:30 AM | Opening Time: Tuesday, July 28, 2026 12:00 PM
Works Single Stage-One Envelope
73 P53549 (66/CWD-II/2025-26) Providing and Installation of ...
Civil Works Directorate, FESCO (Chief Engineer (Operation) FESCO HQ Faisalabad)
Closing Time: Tuesday, July 28, 2026 11:30 AM | Opening Time: Tuesday, July 28, 2026 12:00 PM
Works Single Stage-One Envelope
74 P54518 EP-53 Safe loading, Unloading, Carriage, Transport...
Project Director Construction Circle, LESCO (Lahore Electricity Supply Company (LESCO))
Closing Time: Tuesday, July 28, 2026 11:30 AM | Opening Time: Tuesday, July 28, 2026 12:00 PM
Works Single Stage-One Envelope
75 P54524 EP-54 Safe loading, Unloading, Carriage, Transport...
Project Director Construction Circle, LESCO (Lahore Electricity Supply Company (LESCO))
Closing Time: Tuesday, July 28, 2026 11:30 AM | Opening Time: Tuesday, July 28, 2026 12:00 PM
Works Single Stage-One Envelope
76 P53516 (62/CWD-II/2025-26) Construction of RE office at 1...
Civil Works Directorate, FESCO (Chief Engineer (Operation) FESCO HQ Faisalabad)
Closing Time: Tuesday, July 28, 2026 11:30 AM | Opening Time: Tuesday, July 28, 2026 12:00 PM
Works Single Stage-One Envelope
77 P53552 (67/CWD-II/2025-26) Tower Protection of 132 KV T/L...
Civil Works Directorate, FESCO (Chief Engineer (Operation) FESCO HQ Faisalabad)
Closing Time: Tuesday, July 28, 2026 11:30 AM | Opening Time: Tuesday, July 28, 2026 12:00 PM
Works Single Stage-One Envelope
78 P60077 Refurbishment and Improvement Works of Executive O...
HEC (Engineering Section)
Closing Time: Tuesday, July 28, 2026 01:30 PM | Opening Time: Tuesday, July 28, 2026 02:00 PM
Works Single Stage-One Envelope
79 P54008 FENCING WORKS AT HEC BUILDINGS, KHANSPUR (AYUBIA)
Higher Education Commision (Higher Education Commision (HEC))
Closing Time: Tuesday, July 28, 2026 01:30 PM | Opening Time: Tuesday, July 28, 2026 02:00 PM
Works Single Stage-One Envelope
80 P38066 Procurement, Installation, Testing & Commissioning...
Hydrology and Research Directorate (O&M of Telemetric & Hydromet Network) (Water and Power Development Authority (WAPDA) / Member (Water))
Closing Time: Tuesday, July 28, 2026 02:00 PM | Opening Time: Tuesday, July 28, 2026 02:30 PM
Works Single Stage-One Envelope
81 P59396 PROVIDING AND LAYING C.C TUFF PAVER IN UC-06, BAGH...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:00 AM
Works Single Stage-One Envelope
82 P60785 REHABILITATION/ CONSTRUCTION OF CHILDREN PARK AT S...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:00 AM
Works Single Stage-One Envelope
83 P59774 REHABILITATION/ CONSTRUCTION OF METALLED ROAD IN ...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:00 AM
Works Single Stage-One Envelope
84 P55013 PROVIDING & LAYING SEWERAGE LINE & C.C TUFF PAV...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:30 AM
Works Single Stage-One Envelope
85 P57776 PROVIDING & LAYING SEWERAGE LINE AND CC TUFF PAVE...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:30 AM
Works Single Stage-One Envelope
86 P59366 PROVIDING AND LAYING C.C TUFF PAVER IN UC-05, LAND...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:00 AM
Works Single Stage-One Envelope
87 P59639 REHABILITATION/ CONSTRUCTION OF METALLED ROAD IN ...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:00 AM
Works Single Stage-One Envelope
88 P60038 REHABILITATION/ CONSTRUCTION OF ASLAM PARK AT SECO...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:00 AM
Works Single Stage-One Envelope
89 P58352 PROVIDING & LAYING SEWERAGE LINE & C.C TUFF PAVER...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:30 AM
Works Single Stage-One Envelope
90 P59339 PROVIDING & LAYING SEWERAGE LINE FROM SCHOOL ROAD...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:30 AM
Works Single Stage-One Envelope
91 P58619 PROVIDING & LAYING SEWERAGE LINE & C.C TUFF PAVER...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:30 AM
Works Single Stage-One Envelope
92 P59192 PROVIDING & LAYING SEWERAGE LINE & C.C TUFF PAVER...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:30 AM
Works Single Stage-One Envelope
93 P59402 PROVIDING AND LAYING R.C.C SEWERAGE PIPE LINE IN U...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:00 AM
Works Single Stage-One Envelope
94 P59972 PROVIDING AND LAYING P.E WATER PIPE LINE IN UC-10,...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:00 AM
Works Single Stage-One Envelope
95 P58865 PROVIDING AND LAYING RCC SEWERAGE LINE AT HUSSAINI...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:30 AM
Works Single Stage-One Envelope
96 P59306 PROVIDING & LAYING SEWERAGE LINE & C.C TUFF PAVER...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:30 AM
Works Single Stage-One Envelope
97 P60125 PROVIDING AND LAYING RCC SEWERAGE LINE FROM M.A S...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:30 AM
Works Single Stage-One Envelope
98 P59141 PROVIDING AND LAYING CC TUFF PAVER AT DIFFERENT ST...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:30 AM
Works Single Stage-One Envelope
99 P60797 CONSTRUCTION OF R.C.C. CULVERT IN UC-01 TO UC-10,L...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:00 AM
Works Single Stage-One Envelope
100 P59789 REHABILITATION/ CONSTRUCTION OF METALLED ROAD IN U...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
Closing Time: Wednesday, July 29, 2026 10:30 AM | Opening Time: Wednesday, July 29, 2026 11:00 AM
Works Single Stage-One Envelope
Page 1 of 15
Annual Public Assets Procurement Plan of Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Year 2026-27
Total: 85
Go Back
Search Filters
Reset Filter

Open Procurements

10

Estimated Cost

PKR 3.23B

Under Evaluation

33

Estimated Cost

PKR 2.63B

Evaluation Completed

12

Estimated Cost

PKR 2.38B

LoI ISSUED

3

Estimated Cost

PKR 29.24M

Planned

23

Cancelled Procurements

4

Procurement Types:
Goods
Works
Non-Consultancy Services
Consultancy Services
# Procurement Ref Procurement Title Procurement Status Type/Procedure Details
1 P40826 ACSR Conductor Osprey
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, May 25, 2026 12:00 AM
Closed on: Tuesday, June 16, 2026 11:00 AM
Goods Single Stage-One Envelope
2 P40841 Procurement of LT CTs
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, June 1, 2026 12:00 AM
Closed on: Tuesday, June 23, 2026 11:00 AM
Goods Single Stage-One Envelope
3 P41102 ACSR Conductor Dog
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Friday, May 29, 2026 12:00 AM
Closed on: Tuesday, June 16, 2026 11:00 AM
Goods Single Stage-One Envelope
4 P41105 AAC Conductor Wasp
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Friday, May 29, 2026 12:00 AM
Closed on: Tuesday, June 16, 2026 11:00 AM
Goods Single Stage-One Envelope
5 P41108 SID Cable 4-C 120mm2 Armored
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Friday, May 29, 2026 12:00 AM
Closed on: Tuesday, June 16, 2026 11:00 AM
Goods Single Stage-One Envelope
6 P41111 15 KV XLPE Cable S/C 4/0AWG 120mm2 Armored
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, June 1, 2026 12:00 AM
Closed on: Tuesday, June 16, 2026 11:00 AM
Goods Single Stage-One Envelope
7 P41114 15 KV XLPE Cable 3/C 4/0AWG 120mm2 Armored
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Friday, May 29, 2026 12:00 AM
Closed on: Tuesday, June 16, 2026 11:00 AM
Goods Single Stage-One Envelope
8 P41117 15 KV XLPE Power Cable S-C 120mm2 Unarmoured
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Friday, May 29, 2026 12:00 AM
Closed on: Tuesday, June 16, 2026 11:00 AM
Goods Single Stage-One Envelope
9 P41120 15 KV XLPE Power Cable 3-C 120mm2 Armoured
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Friday, May 29, 2026 12:00 AM
Closed on: Tuesday, June 16, 2026 11:00 AM
Goods Single Stage-One Envelope
10 P41123 15 KV XLPE Power Cable S-C 500MCM 240mm2 Unarmoure...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Friday, May 29, 2026 12:00 AM
Closed on: Tuesday, June 16, 2026 11:00 AM
Goods Single Stage-One Envelope
11 P41129 15 KV XLPE Power Cable S-C 500MCM 240mm2 Armoured
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Friday, May 29, 2026 12:00 AM
Closed on: Tuesday, June 16, 2026 11:00 AM
Goods Single Stage-One Envelope
12 P41132 GS Wire 10mm
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Friday, May 29, 2026 12:00 AM
Closed on: Tuesday, June 16, 2026 11:00 AM
Goods Single Stage-One Envelope
13 P41387 HT Steel Structure 34'-8
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Friday, June 5, 2026 12:00 AM
Closed on: Tuesday, June 23, 2026 11:00 AM
Goods Single Stage-One Envelope
14 P41390 HT Steel Structure 45'
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Friday, June 5, 2026 12:00 AM
Closed on: Tuesday, June 23, 2026 11:00 AM
Goods Single Stage-One Envelope
15 P41393 HT Steel Structure 58'
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Friday, June 5, 2026 12:00 AM
Closed on: Tuesday, June 23, 2026 11:00 AM
Goods Single Stage-One Envelope
16 P41396 11 KV Termination Kits (Indoor/Outdoor)
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Friday, June 5, 2026 12:00 AM
Closed on: Tuesday, June 23, 2026 11:00 AM
Goods Single Stage-One Envelope
17 P41399 11 KV Dropout Cutout (S-Ins.)
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, June 8, 2026 12:00 AM
Closed on: Tuesday, June 30, 2026 11:00 AM
Goods Single Stage-One Envelope Planned
18 P41402 11 KV Steel Cross Arms
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, June 8, 2026 12:00 AM
Closed on: Tuesday, June 30, 2026 11:00 AM
Goods Single Stage-One Envelope
19 P41405 11 KV Steel Cross Arms for D. Fitting Mounting
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, June 8, 2026 12:00 AM
Closed on: Tuesday, June 30, 2026 11:00 AM
Goods Single Stage-One Envelope
20 P41408 11 KV Pin for Steel Cross Arms
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, June 8, 2026 12:00 AM
Closed on: Tuesday, June 30, 2026 11:00 AM
Goods Single Stage-One Envelope
21 P41411 Double Arming Bolts
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, June 8, 2026 12:00 AM
Closed on: Tuesday, June 30, 2026 11:00 AM
Goods Single Stage-One Envelope
22 P41414 Parllel Grove Connectors (PGs)
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, June 8, 2026 12:00 AM
Closed on: Tuesday, June 30, 2026 11:00 AM
Goods Single Stage-One Envelope
23 P41417 LT Spool Insulator
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, June 8, 2026 12:00 AM
Closed on: Tuesday, June 30, 2026 11:00 AM
Goods Single Stage-One Envelope
24 P41420 11 KV Pin Insulator
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, June 8, 2026 12:00 AM
Closed on: Tuesday, June 30, 2026 11:00 AM
Goods Single Stage-One Envelope
25 P41423 11 KV Disc Insulator
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, June 8, 2026 12:00 AM
Closed on: Tuesday, June 30, 2026 11:00 AM
Goods Single Stage-One Envelope
26 P43808 HIRING OF CONSULTANT FOR THE STUDY ON THE TECHNICA...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Wednesday, June 24, 2026 08:00 AM
Closed on: Tuesday, July 21, 2026 11:00 AM
Consultancy Services Single Stage-Two Envelope
27 P44243 Recycling of Scrap ACSR Conductor into ACSR Osprey...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Works Single Stage-One Envelope Planned
28 P44492 Recycling of Scrap ACSR Conductor into ACSR Osprey...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, June 8, 2026 12:00 AM
Closed on: Tuesday, July 7, 2026 11:00 AM
Goods Single Stage-One Envelope
29 P49016 Procurement of 400 KVA Pole Mounted Distribution ...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, June 15, 2026 04:52 PM
Closed on: Thursday, July 2, 2026 11:00 AM
Goods Single Stage-One Envelope
30 P49229 Procurement of 630 KVA Pole Mounted Distribution T...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, June 15, 2026 05:58 PM
Closed on: Thursday, July 2, 2026 11:00 AM
Goods Single Stage-One Envelope
31 P50927 T/3104-Reclamation of Irreparable Damaged Transfor...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Tuesday, June 23, 2026 06:43 PM
Closed on: Thursday, July 9, 2026 11:00 AM
Goods Single Stage-One Envelope
32 P52178 T/3105-Reclamation of Irreparable Damaged Transfor...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Tuesday, June 23, 2026 07:25 PM
Closed on: Thursday, July 9, 2026 11:00 AM
Goods Single Stage-One Envelope Planned
33 P52424 T/3106-Reclamation of Irreparable Damaged Transfor...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Tuesday, June 23, 2026 07:50 PM
Closed on: Thursday, July 9, 2026 11:00 AM
Goods Single Stage-One Envelope Planned
34 P52451 T/3107-Reclamation of Irreparable Damaged Transfor...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Wednesday, June 24, 2026 02:58 PM
Closed on: Thursday, July 9, 2026 11:00 AM
Goods Single Stage-One Envelope
35 P52460 T/3108-Reclamation of Irreparable Damaged Transfor...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Wednesday, June 24, 2026 02:17 PM
Closed on: Thursday, July 9, 2026 11:00 AM
Goods Single Stage-One Envelope
36 P52973 T/3112-Purchase of Toner for Printer HP Laser Jet ...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, June 29, 2026 09:36 PM
Closed on: Thursday, July 16, 2026 11:00 AM
Goods Single Stage-One Envelope
37 P52976 T/3114-Purchase of Ribbon for Line Printer
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, June 29, 2026 10:06 PM
Closed on: Thursday, July 16, 2026 11:00 AM
Goods Single Stage-One Envelope
38 P53006 T/3113- Maintenance Kit for Printer HP Laser Jet E...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, June 29, 2026 10:48 PM
Closed on: Thursday, July 16, 2026 11:00 AM
Goods Single Stage-One Envelope
39 P53009 T/3110-Purchase of UTILITY BILLS FORM(Gen) A-5
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, June 29, 2026 06:45 PM
Closed on: Thursday, July 16, 2026 11:00 AM
Goods Single Stage-One Envelope
40 P53012 T/3111-Purchase of UTILITY BILLS FORM (A4) & Plain...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, June 29, 2026 06:40 PM
Closed on: Thursday, July 16, 2026 11:00 AM
Goods Single Stage-One Envelope
41 P56027 T/3116- Procurement of 25KVA Distribution Transfor...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Friday, July 10, 2026 06:00 PM
Closed on: Tuesday, July 28, 2026 11:00 AM
Goods Single Stage-One Envelope
42 P56096 T/3117- Procurement of 100KVA Distribution Transfo...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Friday, July 10, 2026 06:35 PM
Closed on: Tuesday, July 28, 2026 11:00 AM
Goods Single Stage-One Envelope
43 P56141 T/3118- Procurement of 200KVA Distribution Transfo...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Friday, July 10, 2026 07:32 PM
Closed on: Tuesday, July 28, 2026 11:00 AM
Goods Single Stage-One Envelope
44 P57338 Supply of APMS (Asset Performance Management Syste...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Thursday, July 9, 2026 07:45 PM
Closed on: Friday, July 24, 2026 11:00 AM
Goods Single Stage-One Envelope
45 P65561 T-3119 for supply of 11 KV Dropout Cutout (S-Ins.)
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, July 20, 2026 06:50 PM
Closed on: Tuesday, August 4, 2026 11:00 AM
Goods Single Stage-One Envelope
46 P65567 T-3120 for supply of LT Steel Structure 30'-8"
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, July 20, 2026 06:37 PM
Closed on: Tuesday, August 4, 2026 11:00 AM
Goods Single Stage-One Envelope
47 P65570 T-3121 for supply of HT Steel Structure 34'-8"
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, July 20, 2026 06:52 PM
Closed on: Tuesday, August 4, 2026 11:00 AM
Goods Single Stage-One Envelope
48 P65576 T-3122 for supply of HT Steel Structure 45'
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, July 20, 2026 06:34 PM
Closed on: Tuesday, August 4, 2026 11:00 AM
Goods Single Stage-One Envelope
49 P65579 T-3123 for supply of HT Steel Structure 58'
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, July 20, 2026 06:30 PM
Closed on: Tuesday, August 4, 2026 11:00 AM
Goods Single Stage-One Envelope
50 P65582 T-3124 for supply of ACSR Conductor Osprey
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: Monday, July 20, 2026 06:35 PM
Closed on: Tuesday, August 4, 2026 11:00 AM
Goods Single Stage-One Envelope
51 P65585 T-3125 for supply of ACSR Conductor Rabbit
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Goods Single Stage-One Envelope Planned
52 P65588 T-3126 for supply of AAC Conductor Ant
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Goods Single Stage-One Envelope Planned
53 P65591 T-3127 for supply of SID Cable 2-C 10mm2
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Goods Single Stage-One Envelope Planned
54 P65594 T-3128 for supply of SID Cable 4-C 70mm2
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Goods Single Stage-One Envelope Planned
55 P65597 T-3129 for supply of SID Cable 4-C 120mm2
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Goods Single Stage-One Envelope Planned
56 P65600 T-3130 for supply of 15 KV XLPE Power Cable S-C 50...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Goods Single Stage-One Envelope Planned
57 P65603 T-3131for supply of Recycling of Scrap ACSR Conduc...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Goods Single Stage-One Envelope Planned
58 P65609 T-3132 for supply of Anchor Shackle & Eye Nut
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Goods Single Stage-One Envelope Planned
59 P65612 T-3133 for supply of D. Shackle Assembly
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Goods Single Stage-One Envelope Planned
60 P65615 T-3134 for supply of Stay Rod (Complete)
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Goods Single Stage-One Envelope Planned
61 P65618 T-3135 for supply of Earth Rod (Complete)
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Goods Single Stage-One Envelope Planned
62 P65621 T-3136 for supply of Double Pole Platform
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Goods Single Stage-One Envelope Planned
63 P65624 T-3137 for supply of Nut & Bolts
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Goods Single Stage-One Envelope Planned
64 P65627 T-3138 for supply of HT Insulated Conductor Osprey
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Goods Single Stage-One Envelope Planned
65 P65630 T-3139 for supply of HT Insulated Conductor Dog
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Goods Single Stage-One Envelope Planned
66 P65633 T-3140 for supply of HT Insulated Conductor Rabbit
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Goods Single Stage-One Envelope Planned
67 P65636 T-3141 for supply of LT Insulated Conductor Wasp
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Goods Single Stage-One Envelope Planned
68 P65639 T-3142 for supply of LT Insulated Conductor Ant
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Goods Single Stage-One Envelope Planned
69 P65864 T/3143- Recycling of mixed damaged / dismantled HT...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Non-Consultancy Services Single Stage-One Envelope Planned
70 P65867 T/3144- Recycling of mixed damaged / dismantled HT...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Non-Consultancy Services Single Stage-One Envelope Planned
71 P65870 T/3145- Recycling of mixed damaged / dismantled HT...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
--
Non-Consultancy Services Single Stage-One Envelope Planned
72 P66179 T/3150-Hiring of Consultant for calculation of Tec...
Material Management Directorate, FESCO (Faisalabad Electric Supply Company (FESCO))
Published on: 3h 2m Left
Closed on: Tuesday, August 11, 2026 11:00 AM
Consultancy Services Single Stage-Two Envelope Planned