Every grievance filed against this reference, with the official GRC decision and the time it took to redress.
Deputy Chief Mechanical Engineer
Department: Ministry of Railways
Email: engr.saqlain01@gmail.com
Additional General Manager (AGM)
Department: Ministry of Railways
Email: mech_agm@yahoo.com
Chief Engineer
Department: Ministry of Railways
Email: cme.carriage@yahoo.com
No grievances have been raised for this procurement.
Chief Controller Purchase
Department: Pakistan Railways
Email: ccp@pakrail.gov.pk
Chief Engineer
Department: Ministry of Railways
Email: cmelocopk@yahoo.com
Chief Accounts Officer
Department: Ministry of Railways
Email: facaopr@gmail.com
Another clarification required is as under:
|
1 |
Items / Lots, page 30 ("Schedule: 120") |
The Items / Lots table states a delivery schedule of "120 days" without indicating whether this is the period for uplift of the entire tendered quantity from a single date, or the lead time for delivery of each supply order placed by Pakistan Railways from time to time. This clarification is material, as the required delivery pattern has a direct bearing on production scheduling, stock holding, working capital and, under a fixed price, on the quoted rate. |
|
1 |
Packing / Drum Specification |
Items/Lots page 30; Evaluation Criteria page 29 |
The bidding document does not specify drum material or gauge. Confirmation required as this is a direct cost input. |
|
2 |
Third Party Testing |
Evaluation Criteria page 29 |
Testing is to be carried out by pre-qualified firms at the bidder's cost. The list of pre-qualified firms has not been provided |
|
3 |
Warranty Period vs Shelf Life |
Items/Lots page 30; Evaluation Criteria page 29 |
A warranty of 24 months has been mentioned against shelf life of 15 months. Self contradiction |
|
4 |
Approved Brand / Equivalent |
Evaluation Criteria page 29 |
The tender invites equivalents but does not state the approved brand list. |
|
5 |
Manufacturer Authorisation |
Items/Lots page 30; ITB Clause 11.1(2)-page 9 |
Unclear when the bidder is itself the manufacturer and blender, Manufacturer Authorisation Form need to be filled for self. |
|
6 |
Fixed Price / Price Adjustment |
BDS Clause 8 page 25; ITB 15.6 page 10; GCC 29.1-page 43 |
The price is required to be firm with no escalation permissible, whereas the product cost is calculated by imported base oil, additives and exchange rate, all of which are outside the bidder's control. Clarification is sought. |
|
7 |
Price Schedule Format |
Price Schedule page 33 |
Confirmation is needed on whether the unit price is quoted inclusive or exclusive of GST, whether drum cost is shown separately, and whether a rate breakup is required with the bid. |
|
8 |
Liquidated Damages Rate |
SCC GC Clause 22 page 47; GCC 22.1-page 41 |
The SCC quotes a range of 0.07% to 10.00% of contract value, while GCC 22.1 refers to the delivered price of delayed goods. The applicable rate per week, basis of application and maximum cap need to be confirmed. |