Procurement of Single Phase AMI Meter ...

Go Back
Procurement Details

Raised Grievances

Every grievance filed against this reference, with the official GRC decision and the time it took to redress.

0 Cases
0 Resolved
0 Rejected
Mr. Ijaz Ahmed
Convener

Chief

Department: Islamabad Electric Supply Company (IESCO)

Email: ce_pe@iesco.com.pk

Mr. Shakeel Ahmed
Member

Deputy Director

Department: Islamabad Electric Supply Company (IESCO)

Email: dd_proc@iesco.com.pk

Mr. Muhammad Waheed
Member

Deputy Director

Department: Islamabad Electric Supply Company (IESCO)

Email: dmcaadmn_fd@iesco.com.pk

No Grievance Raised

No grievances have been raised for this procurement.

Procurement Committee Details
Mr. ZUBAIR AKHTAR
Convener

General Manager

Department: Islamabad Electric Supply Company (IESCO)

Email: gm_tech@iesco.com.pk

Mr. Nadeem Sadiq Malik
Member

Chief Engineer

Department: Islamabad Electric Supply Company (IESCO)

Email: ce_mm@iesco.com.pk

Mr. Nasir Hanif
Member

Additional Director General

Department: Islamabad Electric Supply Company (IESCO)

Email: m_mm@iesco.com.pk

Mr. Raees Haider
Member

Director Finance

Department: Islamabad Electric Supply Company (IESCO)

Email: fdiesco@yahoo.com

Mr. Umair Aslam
Member

Additional Director

Department: Islamabad Electric Supply Company (IESCO)

Email: dd_pnpd_mm@iesco.com.pk

Clarifications

Query
TOR (Testing Fee)

Please confirm the applicable interoperability fee so that we may incorporate the same in our bid and submit a comprehensive and accurate proposal.

Submitted on: Sep 06, 2026, 07:34 PM
Clarification
TOR (Testing Fee)

Bidder has to negotiate and pay charges to the interoperability lab at its own.

Responded on: Sep 07, 2026, 04:37 PM

Query
Mechanical Features (Specidication)

The specified mechanical design, features and drawings appear to correspond to a particular manufacturer's existing meter design and may consequently restrict competition by providing an undue advantage to the manufacturer already possessing such design. In the interest of ensuring fair and open competition, it is requested that bidders be allowed to propose their own technically compliant mechanical design / solution, provided that all mandatory requirements, functional parameters and performance criteria specified in the bidding documents are fully satisfied.

Submitted on: Sep 06, 2026, 07:34 PM
Clarification
Mechanical Features (Specification)

Please follow IESCO AMI Meter Specification.

Responded on: Sep 07, 2026, 04:36 PM

Query
Delivery Schedule

Bidder can only submit samples for testing within a specified time. However, the time required to conduct interoperability, and prototype testing is beyond bidder’s control. It is therefore requested to please amend to read as:

“For local bidders, 50% quantity within 90 days & balance 50% quantity within 120 days from the date of issuance of P.O, having valid prototype approval and interoperability certificate of offered type meter”

Submitted on: Sep 06, 2026, 07:34 PM
Clarification
Delivery Schedule

Please follow the delivery schedule as prescribed in the bidding documents.

Responded on: Sep 07, 2026, 04:35 PM

Query
BDS Clause 4

Prototype testing and interoperability testing may be conducted independently or in parallel or in any sequence. Please confirm.

Submitted on: Sep 06, 2026, 07:34 PM
Clarification
Prototype testing and interoperability testing may be conducted independently or in parallel or in any sequence. Please confirm.

Both tests could be arranged parallel.

Responded on: Sep 07, 2026, 04:34 PM

Query
Evaluation Criteria

There will be no witnesses in case the meters are type tested aboard? Please confirm.

Submitted on: Sep 06, 2026, 07:33 PM
Clarification
There will be no witnesses in case the meters are type tested aboard? Please confirm.

The type tests of the meters tested abroad shall also be witnessed by the 2 IESCO Inspectors at cost and arrangement of manufacturer/bidder as mentioned in the BDS clause-1 evaluation criteria xiii of the bidding documents.

Responded on: Sep 07, 2026, 04:32 PM

Query
Eligibility Criteria

  • Time required for prototype approval is beyond bidder control, it is therefore suggested that the bidder shall be liable for offering the meters for prototype within a desired period and the delivery period should be reckoned from the date of issuance of prototype approval. Please amend.
  • If the meters are manufactured locally, prototype approval shall be carried out at manufacturer’s premises. Please confirm.

Submitted on: Sep 06, 2026, 07:33 PM
Clarification
Eligibility Criteria

 Please follow the delivery schedule and other conditions pertaining to prototype as prescribed in bidding documents.

Responded on: Sep 07, 2026, 04:31 PM

Query
Evaluation Criteria

As conventional meters and smart meters are completely different technologies altogether, it is suggested that only AMI related experience should be considered for eligibility of a bidder. Please amend.

Submitted on: Sep 06, 2026, 07:33 PM
Clarification
Evaluation Criteria- As conventional meters and smart meters are completely different technologies altogether, it is suggested that only AMI related experience should be considered for eligibility of a bidder. Please amend.

Please abide by the requirements mentioned in the bidding documents.

Responded on: Sep 07, 2026, 04:29 PM

Query
Table of Requirements (Mechanical Design)

Please confirm that table of requirement is still applicable, and bidders may propose their own technically compliant design / solution against requirements identified as desirable.

Submitted on: Sep 06, 2026, 07:32 PM
Clarification
Table of Requirements (Mechanical Design)

IESCO AMI Meters Specifications along with table of requirement is to be followed. Additionally please refer to the Note mentioned on the last page of Pre-Bid minutes issued vide.6799-6810/P&PD/CE(MM)/IESCO/ dated:10.08.2026

Responded on: Sep 07, 2026, 04:28 PM

Query
Domestic Preference

Since it’s an NCB, how will domestic preference be applicable in this tender? Please clarify.

Submitted on: Sep 06, 2026, 07:32 PM
Clarification
Since it’s an NCB, how will domestic preference be applicable in this tender? Please clarify.

As the invitation of bids is open for all prospective bidders foreign  as well as local, however if a local manufacturer wants to claim price preference over a foreign manufacturer    it has to obtain a dedicated Bonafide local manufacturer certificate of value addition according to IESCO's AMI Meters Specification for relevant type of meter from Engineering Development Board (EDB) and submit with the technical bid.

Responded on: Sep 07, 2026, 04:27 PM

Query
Eligible Bidders

As the tender is being invited under the National Competitive Bidding (NCB) procedure, foreign / international manufacturers should be eligible to participate only through a Joint Venture (JV) with a local bidder registered as a manufacturer under M5 category. Please confirm.

Submitted on: Sep 06, 2026, 07:32 PM
Clarification
Eligible Bidders

Please be informed that requirement of registration under local manufacturing category M-5 stands lifted for the subject tender. Hence foreign bidders/manufacturers are eligible to participate both directly and indirectly.

Responded on: Sep 07, 2026, 04:24 PM

Query
Request for extension of the bid submission deadline.

Respected Sir,

CDigital is preparing a bid against the above procurement, for which the deadline is presently. We respectfully request an extension of four weeks.

Several distribution companies currently have AMI meter procurements open with closely spaced deadlines. Manufacturer's authorisations, capacity confirmations and firm offers are consequently taking considerably longer to obtain than they would for a single tender.

The remaining period is also short for the supporting documentation required from foreign principals, being type test reports, DLMS certification, supply records and performance certificates, some of which require attestation, and for the arrangement and physical lodgement of the bid security.

A modest extension would allow a greater number of substantially responsive bids to be received, which we respectfully submit would improve price competition without prejudice to any bidder. Instructions to Bidders clause [9.4] provides for the procuring agency to extend the deadline at its discretion. Should four weeks not be possible, we would be grateful for such shorter extension as you consider appropriate.

Thank you for your consideration.

Yours faithfully,

CDigital

Submitted on: Aug 27, 2026, 04:24 PM
Clarification
Request for extension of the bid submission deadline.

The bid submission deadline has already been extended upto 21.09.2026 

Responded on: Sep 01, 2026, 10:09 AM

Query
Request for Clarifications

Dear Sir,

Please find the attachment.

View PDF Submitted on: Jul 13, 2026, 03:03 PM
Clarification
Clarifications

please find attached response of your queries..

View Response PDF Responded on: Aug 11, 2026, 10:20 AM

Query
Clarification

Clarification

View PDF Submitted on: Jul 10, 2026, 11:31 AM
Clarification
Clarification

Please find attached response of your queries.

View Response PDF Responded on: Aug 11, 2026, 10:16 AM

Query
Request for Clarifications – Tender Documents.

Please find the attachment. 

View PDF Submitted on: Jul 09, 2026, 09:06 PM
Clarification
Request for Clarifications – Tender Documents.

Please find attached response of your queries.

View Response PDF Responded on: Aug 11, 2026, 10:15 AM

Query
Price Schedule Forms

Clause: “50% quantity within 45 days & balance 50% quantity within 75 days from the date of issuance of P.O, where bidder (local / foreign) has valid prototype approval and Interoperability certificate of offered type meter” “Otherwise full quantity within 120 days from the date of issuance of PO inclusive of interoperability and prototype testing”

Question:  Please amend to read as “50% quantity within 90 days & balance 50% quantity within 150 days from the date of issuance of P.O or date of issuance of interoperability certificate or date of issuance of prototype approval which ever is later.”

Submitted on: Jul 11, 2026, 03:19 PM
Clarification
Delivery schedule

“50% quantity within 60 days & balance 50% quantity within 90 days from the date of issuance of P.O where bidder has valid prototype approval and Interoperability certificate of offered type meter”, “Otherwise full quantity within 150 days from the date of issuance of PO inclusive of interoperability and prototype testing”

Responded on: Aug 11, 2026, 10:06 AM

Query
Price Schedule Forms

Clause: The Prices quoted by the bidder on the E-PADS in price schedule section shall be deemed inclusive of all applicable taxes, duties, and other statutory charges.

Question: Please shall be inclusive of GST too. Please confirm.

Submitted on: Jul 11, 2026, 03:19 PM
Clarification
Price Schedule Forms

Yes, the price shall be inclusive of GST.

Responded on: Aug 11, 2026, 10:04 AM

Query
GCC Performance Security

Clause: Within Seven (07) days from the issuance of acceptance letter from the Procuring Agency, the successful Bidder shall furnish the Performance Guarantee

Question: Performance Guarantee should be submitted within 14 days as regular practice. Please amend

Submitted on: Jul 11, 2026, 03:20 PM
Clarification
GCC Performance Security

Performance Guarantee should be submitted within 10 days.

Responded on: Aug 11, 2026, 10:03 AM

Query
TOR (Testing Fee)

Clause: Testing charges at the rate of PKR 500 (Pakistani Rupees five hundred) per single phase meter, applicable to the entire order quantity, in case of interoperability test conducted in IESCO Own Lab (if operational).

Question: If a bidder already has the interoperability certificate, new testing shall not be required and fee shall also not be paid. Please confirm.

Submitted on: Jul 11, 2026, 03:24 PM
Clarification
TOR (Testing Fee) If a bidder already has the interoperability certificate, new testing shall not be required and fee shall also not be paid.

Agreed

Responded on: Aug 11, 2026, 10:02 AM

Query
TOR (Testing Fee)

Clause: Testing charges at the rate of PKR 500 (Pakistani Rupees five hundred) per single phase meter, applicable to the entire order quantity, in case of interoperability test conducted in IESCO Own Lab (if operational).

Question: Please confirm the applicable charges in case of independent lab.

Submitted on: Jul 11, 2026, 03:24 PM
Clarification
TOR (Testing Fee) Applicable charges in case of independent lab.

In case of any lab other than IESCO in house lab, vendor will negotiate and pay charges to the lab at its own.

Responded on: Aug 11, 2026, 10:00 AM

Query
TOR (Interoperability Certificate)

Clause: This certificate may be utilized by the bidder for future procurements, subject to the validity period specified in the certificate.

Question: What will be the validity period of this interoperability certificate? It is suggested that certificate should be valid until or unless there is any change of component in the product.

 

 

Submitted on: Jul 11, 2026, 03:25 PM
Clarification
TOR (Interoperability Certificate)

The certificate remains valid unless any change is proposed by manufacturer / IESCO.

Responded on: Aug 11, 2026, 09:57 AM

Query
TOR (Prototype)

Clause: If prototype is done by anyone other than PPMC, PPMC will not carry out witnessing of this proto-type testing and IESCO representatives will be nominated to witness and verify the same.

Question: Prototype testing is to done by IESCO inspectors only. Please confirm.

Submitted on: Jul 11, 2026, 03:26 PM
Clarification
TOR (Prototype)

Yes, prototype testing is to be witnessed by IESCO.

Responded on: Aug 11, 2026, 09:55 AM

Query
TOR (DLMS)

Clause: DLMS certification of meter model proposed to be supplied to Employer from DLMS UA.

Question: DLMS certificate is to be provided by successful bidder only. Please confirm.

Submitted on: Jul 11, 2026, 03:27 PM
Clarification
DLMS certification

Yes

Responded on: Aug 11, 2026, 09:52 AM

Query
General Requirements

Clasue: Type: Single-phase, 2-wire, whole current, bi-directional

Question: Single meters cannot be used for bi-directional applications as per NEPRA guidelines. Please amend.

Submitted on: Jul 11, 2026, 03:27 PM
Clarification
General Requirements

Meter will be bi-directional as demanded in IESCO AMI specification.

Responded on: Aug 11, 2026, 09:51 AM

Query
SCC Performance Security

Clause: The amount of performance security (or guarantee), as a percentage of the Purchase Order Price, shall be ten (10%) percent of the Contract Price in favor of CEO IESCO.

Question: Performance guarantee should be 5% as per standard practice. Please amend.

Submitted on: Jul 11, 2026, 03:28 PM
Clarification
Performance Guarantee

The amount of performance security (or guarantee), as a percentage of the Purchase Order Price, shall be five (5%) percent of the Contract Price in favor of CEO IESCO.

Responded on: Aug 11, 2026, 09:48 AM

EPADS Step 9 – Annexures Upload Size Issue

Dear Sir,

While submitting the tender on EPADS, Step 9 – Annexures has a 5 MB upload limit for each required document, which is insufficient for large documents.

The IESCO Specifications document is 250+ pages and is required to be signed and stamped before uploading. It is practically impossible to upload such lengthy documents within the 5 MB limit.

Kindly remove the requirement to sign and stamp such lengthy documents, or increase the 5 MB limit for each annexure, so that the tender can be submitted successfully.

Submitted on: Sep 07, 2026, 06:08 PM
Pre Bid Meeting
No pre-bid meeting has been conducted.
Corrigendum
5
# Corrigendum Number Corrigendum Date Old Document New Document
1 CORR-P54254-005 Monday, August 31, 2026 02:35 PM View PDF View PDF
2 CORR-P54254-004 Wednesday, August 19, 2026 03:24 PM View PDF View PDF
3 CORR-P54254-003 Tuesday, August 4, 2026 10:18 AM View PDF View PDF
4 CORR-P54254-002 Monday, July 20, 2026 04:09 PM View PDF View PDF
5 CORR-P54254-001 Monday, July 20, 2026 04:05 PM View PDF View PDF

⏳ Time Left for Bid Submission Deadline

00
Days
00
Hours
00
Minutes
00
Seconds