Construction of Fly-Over Bridge at Lab...

Go Back
Procurement Details

Raised Grievances

Every grievance filed against this reference, with the official GRC decision and the time it took to redress.

1 Cases
0 Resolved
0 Rejected
Mr. Abdul Shakoor Pathan
Convener

Manager Civil

Department: Pakistan Infrastructure Development Co. Ltd. (PIDCL)

Email: Shakoor.pathan@pidcl.com.pk

Mr. Muhammad Bux Qureshi
Member

Manager

Department: Pakistan Infrastructure Development Co. Ltd. (PIDCL)

Email: mb.qureshi@pidcl.com.pk

Mr. Ahsan Ali
Member

Member

Department: Pakistan Infrastructure Development Co. Ltd. (PIDCL)

Email: ahsan.ali@pidcl.com.pk

Mr. Muzaffar Jameel
Member

Chief financial officer

Department: Pakistan Infrastructure Development Co. Ltd. (PIDCL)

Email: muzaffar.jameel@pidcl.com.pk

Mr. Umair Sarwar Sial
Member

Assistant Manager

Department: Pakistan Infrastructure Development Co. Ltd. (PIDCL)

Email: umair.sial@pidcl.com.pk

Pending

REQUEST FOR DELETION OF "FOREIGN ENTITIES CERTIFICATE" CONDITION FROM BIDDING DOCUMENTS.

GR0-P107845-001 Submitted on Thursday, September 3, 2026 03:17 PM M/S Hussain Enterprises

Subject: Request for Deletion of “Foreign Entities Certificate” Condition

M/s Hussain Enterprises respectfully requests deletion/waiver of the “Certificate from Foreign Entities” requirement from the Bidding Documents for:

PIDCL/Sindh/PSDP/04/01 – Construction of Flyover Bridge at Labaik Chowk, Latifabad, Hyderabad.
PIDCL/Sindh/PSDP/04/02

The condition appears irrelevant and non-mandatory to the nature and scope of the works and may unnecessarily restrict participation of eligible local and PEC-registered contractors. Its removal would promote fair competition, transparency, equal opportunity, and value for money, in accordance with the principles of the applicable Public Procurement Rules, 2004.

It is therefore requested that the said condition be deleted/waived, allowing all eligible local firms to participate on an equal footing.

HE_packg_1-2.pdf
Uploaded Thursday, September 3, 2026 03:17 PM
Grievance Document
Procurement Committee Details
Mr. Ghulam Murtaza Sheikh
Convener

Manager

Department: Pakistan Infrastructure Development Co. Ltd. (PIDCL)

Email: ghulam.murtaza@pidcl.com.pk

Mr. Niaz Ali
Member

Assistant Manager

Department: Pakistan Infrastructure Development Co. Ltd. (PIDCL)

Email: niaz.ali@pidcl.com.pk

Mr. Mahmood Ali
Member

Assistant Manager

Department: Pakistan Infrastructure Development Co. Ltd. (PIDCL)

Email: am.technical10@pidcl.com.pk

Clarifications
No clarification requests have been received.

Request for Allowing Joint Venture (JV) & Shared the Soil Investigation Report.

Dear Sir,

With reference to the above-mentioned tender, we would like to submit our request regarding the following contract packages:

  1. Contract Package: PIDCL/SINDH/PSDP/04/01-02
  2. Contract Package: PIDCL/SINDH/PSDP/04/10
  1. Keeping in view the nature of the work, it is requested that Joint Venture (JV) participation may kindly be allowed for interested bidders in the above-mentioned contract packages. Allowing JV participation, in general, will enable technically and financially capable firms to combine their resources and expertise, resulting in a wider pool of competitive and qualified bidders.

 

  1. The completion period of works as mentioned in the bid documents is 180 days, this time period is too short as both the works are situated within the city limits and in such areas the work pace always remain slow due to various bottlenecks, it is therefore requested that the time period may be extended from 180 days to 360 days in the best interest of the quality work execution.

 

  1. Furthermore, if a Soil Investigation for the referenced sites has been conducted by the Department, the same be shared with all prospective bidders. Making this report available to everyone will ensure transparency, enable more accurate and realistic cost estimation, and further contribute to healthy competition.

 

  1. It is further submitted that Contract Package: PIDCL/SINDH/PSDP/04/10 falls under Category "C3", and therefore it is requested that JV participation may also be allowed for this category as well, in line with the applicable PEC/PPRA rules for such contracts.

We request that this matter be considered at the earliest, in the interest of a fair and open bidding process for all participants.

Thanking you in anticipation of your favorable response.

Yours sincerely,

 

 

Engr. Khadim Hussain
CEO
M/s Global Engineering Links

View PDF Submitted on: Sep 02, 2026, 07:26 PM
Pre Bid Meeting
No pre-bid meeting has been conducted.
Corrigendum
1
# Corrigendum Number Corrigendum Date Old Document New Document
1 CORR-P107845-001 Wednesday, September 2, 2026 04:03 PM View PDF View PDF

⏳ Time Left for Bid Submission Deadline

00
Days
00
Hours
00
Minutes
00
Seconds