| 301 |
P60296
|
CONSTRUCTION/REHABILATION OF METALLED ROAD FROM AL...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:00 PM
| Opening Time:
Wednesday, July 29, 2026 02:30 PM
|
Works
Single Stage-One Envelope
|
|
| 302 |
P59315
|
PROVIDING AND LAYING SEWERAGE LINE IN SECTOR 11-A,...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:00 PM
| Opening Time:
Wednesday, July 29, 2026 02:30 PM
|
Works
Single Stage-One Envelope
|
|
| 303 |
P61082
|
INSTALLATION OF ELECTRIC MOTOR FOR SEPTIC TANK, 04...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:00 PM
| Opening Time:
Wednesday, July 29, 2026 02:30 PM
|
Works
Single Stage-One Envelope
|
|
| 304 |
P60248
|
CONSTRUCTION/REHABILATION OF METALLED ROAD FROM AL...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:00 PM
| Opening Time:
Wednesday, July 29, 2026 02:30 PM
|
Works
Single Stage-One Envelope
|
|
| 305 |
P60014
|
CONSTRUCTION / REHABLITAITON OF METALLED ROAD UNIT...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:00 PM
| Opening Time:
Wednesday, July 29, 2026 02:30 PM
|
Works
Single Stage-One Envelope
|
|
| 306 |
P59591
|
PROVIDING & LAYING SEWERAGE LINE IN DIFFERENT STRE...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:00 PM
| Opening Time:
Wednesday, July 29, 2026 02:30 PM
|
Works
Single Stage-One Envelope
|
|
| 307 |
P60212
|
CONSTRUCTION/REHABILITATION OF METALLED ROAD FROM ...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:00 PM
| Opening Time:
Wednesday, July 29, 2026 02:30 PM
|
Works
Single Stage-One Envelope
|
|
| 308 |
P59747
|
PROVIDING AND LAYING SEWERAGE LINE IN VARIOUS STRE...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:00 PM
| Opening Time:
Wednesday, July 29, 2026 02:30 PM
|
Works
Single Stage-One Envelope
|
|
| 309 |
P59981
|
CONSTRUCTION OF BOUNDARY WALL IN THARO MENGAL GOTH...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:00 PM
| Opening Time:
Wednesday, July 29, 2026 02:30 PM
|
Works
Single Stage-One Envelope
|
|
| 310 |
P59822
|
PROVIDING & LAYING WATER SUPPLY LINE IN PIR BUX GO...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:00 PM
| Opening Time:
Wednesday, July 29, 2026 02:30 PM
|
Works
Single Stage-One Envelope
|
|
| 311 |
P59417
|
PROVIDING AND LAYING SEWERAGE LINE FROM MAKKI MASJ...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:00 PM
| Opening Time:
Wednesday, July 29, 2026 02:30 PM
|
Works
Single Stage-One Envelope
|
|
| 312 |
P57137
|
PROVIDING AND FIXING CC TUFF PAVER AT DIFFERENT ST...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:30 PM
| Opening Time:
Wednesday, July 29, 2026 03:00 PM
|
Works
Single Stage-One Envelope
|
|
| 313 |
P57116
|
PROVIDING AND FIXING CC TUFF PAVER AT DIFFERENT ST...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:30 PM
| Opening Time:
Wednesday, July 29, 2026 03:00 PM
|
Works
Single Stage-One Envelope
|
|
| 314 |
P56612
|
PROVIDING AND FIXING CC TUFF PAVER AT DIFFERENT ST...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:30 PM
| Opening Time:
Wednesday, July 29, 2026 03:00 PM
|
Works
Single Stage-One Envelope
|
|
| 315 |
P57251
|
PROVIDING AND LAYING 4" 6" 8" AND 12" DIA PE PIPEL...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:30 PM
| Opening Time:
Wednesday, July 29, 2026 03:00 PM
|
Works
Single Stage-One Envelope
|
|
| 316 |
P57032
|
PROVIDING AND FIXING CC TUFF PAVER AT DIFFERENT ST...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:30 PM
| Opening Time:
Wednesday, July 29, 2026 03:00 PM
|
Works
Single Stage-One Envelope
|
|
| 317 |
P57326
|
PROVIDING AND FIXING HIGH MAST POLES WITH 6 X 400 ...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:30 PM
| Opening Time:
Wednesday, July 29, 2026 03:00 PM
|
Works
Single Stage-One Envelope
|
|
| 318 |
P57011
|
PROVIDING AND FIXING CC TUFF PAVER AT DIFFERENT ST...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:30 PM
| Opening Time:
Wednesday, July 29, 2026 03:00 PM
|
Works
Single Stage-One Envelope
|
|
| 319 |
P54593
|
PROVIDING AND FIXING CC TUFF PAVER AT DIFFERENT ST...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:30 PM
| Opening Time:
Wednesday, July 29, 2026 03:00 PM
|
Works
Single Stage-One Envelope
|
|
| 320 |
P56423
|
PROVIDING AND FIXING CC TUFF PAVER AT DIFFERENT ST...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:30 PM
| Opening Time:
Wednesday, July 29, 2026 03:00 PM
|
Works
Single Stage-One Envelope
|
|
| 321 |
P56501
|
PROVIDING AND FIXING CC TUFF PAVER AT DIFFERENT ST...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:30 PM
| Opening Time:
Wednesday, July 29, 2026 03:00 PM
|
Works
Single Stage-One Envelope
|
|
| 322 |
P56402
|
PROVIDING AND FIXING CC TUFF PAVER AT DIFFERENT ST...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:30 PM
| Opening Time:
Wednesday, July 29, 2026 03:00 PM
|
Works
Single Stage-One Envelope
|
|
| 323 |
P56156
|
PROVIDING AND FIXING CC TUFF PAVER AT DIFFERENT ST...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:30 PM
| Opening Time:
Wednesday, July 29, 2026 03:00 PM
|
Works
Single Stage-One Envelope
|
|
| 324 |
P57185
|
PROVIDING AND LAYING 4" 6" 8" AND 12" DIA PE PIPEL...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:30 PM
| Opening Time:
Wednesday, July 29, 2026 03:00 PM
|
Works
Single Stage-One Envelope
|
|
| 325 |
P57086
|
PROVIDING AND FIXING CC TUFF PAVER AT DIFFERENT ST...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Wednesday, July 29, 2026 02:30 PM
| Opening Time:
Wednesday, July 29, 2026 03:00 PM
|
Works
Single Stage-One Envelope
|
|
| 326 |
P61421
|
CONSTRUCTION/REHABLITATION OF METALLED ROAD GHARIB...
General Manager (Engineering)/Chief Engineer , PIDCL, Karachi. (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 327 |
P61394
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT GILG...
General Manager (Engineering)/Chief Engineer , PIDCL, Karachi. (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 328 |
P58169
|
SSGC/SC/PT/EPADS2/14388 (HIRING OF SERVICE FOR HOR...
SSGC (PROCUREMENT DEPARTMENT)
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-Two Envelope
|
|
| 329 |
P60938
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING BETWEE...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 330 |
P61409
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING IN RAHE...
General Manager (Engineering)/Chief Engineer , PIDCL, Karachi. (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 331 |
P60980
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT P- A...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 332 |
P60959
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT SECT...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 333 |
P61244
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT SOOR...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 334 |
P61424
|
CONSTRUCTION/REHABLITATION OF METALLED ROAD FROM 1...
General Manager (Engineering)/Chief Engineer , PIDCL, Karachi. (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 335 |
P61397
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT UNIV...
General Manager (Engineering)/Chief Engineer , PIDCL, Karachi. (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 336 |
P61370
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT BHIT...
Bahria Complex IV, 6th Floor, Ext. Block Gizri, PIDCL, Karachi. (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 337 |
P61019
|
CONSTRUCTION/REHABLITATION OF METALLED ROAD FROM 1...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 338 |
P61337
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT 48-D...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 339 |
P61412
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING IN CHIR...
General Manager (Engineering)/Chief Engineer , PIDCL, Karachi. (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 340 |
P61304
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING FROM TO...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 341 |
P61205
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT P AN...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 342 |
P61103
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT 33-B...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 343 |
P61280
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT GHAZ...
Bahria Complex IV, 6th Floor, Ext. Block Gizri, PIDCL, Karachi. (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 344 |
P61133
|
REPAIR/RENNOVATON OF P AND T COLONY PARK, NA-234, ...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 345 |
P61352
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT 48-E...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 346 |
P61427
|
CONSTRUCTION OF NALA KHAWAJA GHAREEB NAWAZ ROAD, N...
General Manager (Engineering)/Chief Engineer , PIDCL, Karachi. (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 347 |
P61124
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT SOOR...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 348 |
P61289
|
PROVIDING & LAYING SEWERAGE LINE AT SORROUNDING AR...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 349 |
P61400
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT 48-H...
General Manager (Engineering)/Chief Engineer , PIDCL, Karachi (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 350 |
P61265
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING NEAR GH...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 351 |
P61238
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT Y- A...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 352 |
P61415
|
CONSTRUCTION/REHABLITATION OF METALLED ROAD R POLI...
General Manager (Engineering)/Chief Engineer , PIDCL, Karachi. (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 353 |
P61250
|
PROVIDING & LAYING SEWERAGE LINE AT 40-C, NA-234, ...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 354 |
P60920
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT KDA ...
Pakistan Infrastructure Development Company Limited (PIDCL) (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 355 |
P61004
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT Q- A...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 356 |
P61223
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING IN LUCK...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 357 |
P61331
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT SORR...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 358 |
P61403
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING IN NOOR...
General Manager (Engineering)/Chief Engineer , PIDCL, Karachi (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 359 |
P61268
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING FROM SH...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 360 |
P61346
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING FROM IM...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 361 |
P61214
|
CONSTRUCTION/REHABLITATION OF METALLED ROAD IN LUC...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 362 |
P61418
|
CONSTRUCTION/REHABLITATION OF METALLED ROAD OF REH...
General Manager (Engineering)/Chief Engineer , PIDCL, Karachi. (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 363 |
P61259
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT T- A...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 364 |
P61361
|
PROVIDING & LAYING CC TUFF PAVER FLOORING AT 48/B-...
General Manager (Engineering)/Chief Engineer , PIDCL (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 365 |
P60635
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT ALLA...
Bahria Complex IV, 6th Floor, Ext. Block Gizri, Karachi. (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 366 |
P61406
|
CONSTRUCTION/REHABLITATION OF METALLED ROAD / PROV...
General Manager (Engineering)/Chief Engineer , PIDCL, Karachi (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 367 |
P62588
|
PROVIDING/INSTALLATION OF SOLAR SYSTEM OF VARIOUS ...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 368 |
P61376
|
PROVIDING & LAYING C.C TUFF PAVER FLOORING AT SILV...
General Manager (Engineering)/Chief Engineer , PIDCL, Karachi. (Pakistan Infrastructure Development Company Limited (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:00 AM
| Opening Time:
Thursday, July 30, 2026 10:30 AM
|
Works
Single Stage-One Envelope
|
|
| 369 |
P61025
|
PROVIDING AND LAYING C.C TUFF PAVER IN UC-15, LAND...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:00 AM
|
Works
Single Stage-One Envelope
|
|
| 370 |
P61448
|
PROVIDING AND LAYING C.C TUFF PAVER IN UC-30, KORA...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:00 AM
|
Works
Single Stage-One Envelope
|
|
| 371 |
P59900
|
CONSTRUCTION / REHABILITATION OF METALLED ROAD AT ...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:30 AM
|
Works
Single Stage-One Envelope
|
|
| 372 |
P61859
|
CONSTRUCTION / REHABILITATION OF METALLED ROAD AT ...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:30 AM
|
Works
Single Stage-One Envelope
|
|
| 373 |
P62027
|
PROVIDING & LAYING C.C TUFF PAVER AND SEWRAGE PIPE...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:30 AM
|
Works
Single Stage-One Envelope
|
|
| 374 |
P60839
|
PROVIDING AND LAYING PE PIPE LINE AT DIFFERENT STR...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:30 AM
|
Works
Single Stage-One Envelope
|
|
| 375 |
P58145
|
PROVIDING AND LAYING PE PIPE LINE AT DIFFERENT STR...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:30 AM
|
Works
Single Stage-One Envelope
|
|
| 376 |
P61817
|
PROVIDING AND LAYING C.C TUFF PAVER IN UC-15, LAND...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:00 AM
|
Works
Single Stage-One Envelope
|
|
| 377 |
P59996
|
PROVIDING & LAYING C.C TUFF PAVER AT SURROUNDING S...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:30 AM
|
Works
Single Stage-One Envelope
|
|
| 378 |
P60470
|
PROVIDING AND LAYING CC TUFF PAVER AT DIFFERENT ST...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:30 AM
|
Works
Single Stage-One Envelope
|
|
| 379 |
P60989
|
PROVIDING AND LAYING C.C TUFF PAVER IN UC-21, LAND...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:00 AM
|
Works
Single Stage-One Envelope
|
|
| 380 |
P59837
|
PROVIDING AND LAYING P.E WATER SUPPLY LINE AT UC-0...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:00 AM
|
Works
Single Stage-One Envelope
|
|
| 381 |
P61115
|
PROVIDING & LAYING C.C TUFF PAVER AT SURROUNDING S...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:30 AM
|
Works
Single Stage-One Envelope
|
|
| 382 |
P61286
|
PROVIDING AND LAYING C.C TUFF PAVER IN UC-26, KORA...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:00 AM
|
Works
Single Stage-One Envelope
|
|
| 383 |
P60410
|
PROVIDING & LAYING C.C TUFF PAVER AT ESSA GOTH, AL...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:30 AM
|
Works
Single Stage-One Envelope
|
|
| 384 |
P60965
|
PROVIDING AND LAYING C.C TUFF PAVER IN UC-19, LAND...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:00 AM
|
Works
Single Stage-One Envelope
|
|
| 385 |
P57182
|
PROVIDING AND LAYING CC TUFF PAVER FROM JAMAL NOOR...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:30 AM
|
Works
Single Stage-One Envelope
|
|
| 386 |
P58589
|
CONSTRUCTION OF METALLED ROAD AT DIFFERENT STREETS...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:30 AM
|
Works
Single Stage-One Envelope
|
|
| 387 |
P59075
|
PROVIDING & LAYING C.C TUFF PAVER AT VARIOUS STREE...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:30 AM
|
Works
Single Stage-One Envelope
|
|
| 388 |
P60329
|
CONSTRUCTION / REHABILITATION OF METALLED ROAD AT ...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:30 AM
|
Works
Single Stage-One Envelope
|
|
| 389 |
P62360
|
CONSTRUCTION / REHABILITATION OF METALLED ROAD FRO...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:30 AM
|
Works
Single Stage-One Envelope
|
|
| 390 |
P56867
|
PROVIDING AND LAYING PE PIPE LINE AT DIFFERENT STR...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:30 AM
|
Works
Single Stage-One Envelope
|
|
| 391 |
P61010
|
INSTALLATION OF LIGHTS AT UC-01 & UC-03 CANTONMENT...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:30 AM
|
Works
Single Stage-One Envelope
|
|
| 392 |
P61436
|
PROVIDING AND LAYING C.C TUFF PAVER IN UC-28, KORA...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:00 AM
|
Works
Single Stage-One Envelope
|
|
| 393 |
P58478
|
PROVIDING AND LAYING METALLED ROAD & TUFF PAVER & ...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:00 AM
|
Works
Single Stage-One Envelope
|
|
| 394 |
P61820
|
REHABILITATION/ CONSTRUCTION OF METALLED ROAD IN U...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:00 AM
|
Works
Single Stage-One Envelope
|
|
| 395 |
P62321
|
PROVIDING & LAYING SEWERAGE LINE, WATER SUPPLY PI...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:30 AM
|
Works
Single Stage-One Envelope
|
|
| 396 |
P59936
|
PROVIDING AND INSTALLATION OF STREET LIGHTS AND SO...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:00 AM
|
Works
Single Stage-One Envelope
|
|
| 397 |
P60752
|
PROVIDING AND LAYING CC TUFF PAVER AT MALANG HOTEL...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:30 AM
|
Works
Single Stage-One Envelope
|
|
| 398 |
P61100
|
PROVIDING AND LAYING C.C TUFF PAVER IN UC-18, LAND...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:00 AM
|
Works
Single Stage-One Envelope
|
|
| 399 |
P61301
|
PROVIDING AND LAYING C.C TUFF PAVER IN UC-27, KORA...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:00 AM
|
Works
Single Stage-One Envelope
|
|
| 400 |
P58130
|
PROVIDING AND LAYING CC TUFF PAVER AT DIFFERENT ST...
Pakistan Infrastructure Development Co. Ltd. (PIDCL (Pakistan Infrastructure Development Co. Ltd. (PIDCL))
|
Closing Time:
Thursday, July 30, 2026 10:30 AM
| Opening Time:
Thursday, July 30, 2026 11:30 AM
|
Works
Single Stage-One Envelope
|
|